Shop drawings prepared by others must bear whose written approval on the submittal?

Prepare for the AIA Contract Document A201 with engaging flashcards and multiple-choice questions. Understand contract fundamentals and get ready to excel in your exam with detailed hints and explanations.

Multiple Choice

Shop drawings prepared by others must bear whose written approval on the submittal?

Explanation:
The main idea is that shop drawings produced by others must be reviewed and approved by the design professional responsible for the project. In practice, the licensed professional (architect or engineer) signs off in writing on the submittal to confirm that the drawings conform to the contract documents and the design intent. This ensures that fabrication and installation align with the approved design and coordinates with other trades. A supervisor’s signature or owner’s consent isn’t a substitute for this professional approval, and some approval is indeed required for submittals to ensure proper design conformity.

The main idea is that shop drawings produced by others must be reviewed and approved by the design professional responsible for the project. In practice, the licensed professional (architect or engineer) signs off in writing on the submittal to confirm that the drawings conform to the contract documents and the design intent. This ensures that fabrication and installation align with the approved design and coordinates with other trades. A supervisor’s signature or owner’s consent isn’t a substitute for this professional approval, and some approval is indeed required for submittals to ensure proper design conformity.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy